European Union Mining & Natural Resources Reservations open Page created Oct 29, 2026

EU Critical Raw Materials Act Strategic Projects

Promoters of projects designated as Strategic Projects under the EU Critical Raw Materials Act (Regulation (EU) 2024/1252), with project name, host country, raw materials and value-chain stage as set out in the Commission decisions.

Fields we plan to include

Promoter company
Project name
Host country
Raw materials
Value-chain stage (extraction / processing / recycling / substitution)
Designation round and decision
Inside / outside the EU
Promoter website

Data Preview

* Free sample rows, unverified and may contain errors. This list isn't for sale yet.
Promoter companyProjectCountryRaw materials
Rio Narcea Recursos S.A.SourceAguablanca (extraction)SpainCobalt, PGMs, copper, nickel
Tokai COBEX savoieSourceBAM4EVER Phase I&II (processing)FranceGraphite (battery grade)
Geomet s.r.o.SourceCínovec lithium project (extraction and processing)CzechiaLithium (battery grade)
UP Catalyst OUSourceCO2Graphite (processing)EstoniaGraphite (battery grade)
Keliber Technology OySourceKeliber Lithium (extraction and processing)FinlandLithium (battery grade)

Estimated ~110 entries. If people reserve it, we'll try to compile it (we can't compile every list).

* No charge now. Purchase is optional.

What a CRMA Strategic Project designation means

The Critical Raw Materials Act (Regulation (EU) 2024/1252) sets EU benchmarks for 2030: at least 10% of annual consumption of strategic raw materials extracted in the EU, 40% processed in the EU, 25% recycled in the EU, and no more than 65% of any strategic raw material sourced from a single third country. Strategic Projects are the Commission's chosen instruments for reaching those targets.

The Commission adopted its first list of EU projects on 25 March 2025 and a list of projects in third countries on 4 June 2025. A second EU list of 46 projects followed in October 2026, bringing the total to around 106.

What promoters gain

  • Faster permits. Permit-granting for extraction projects is capped at 27 months and for processing and recycling projects at 15 months, and projects are treated as being of overriding public interest.
  • Financing support. The Commission, the EIB and Member States coordinate access to finance through the Critical Raw Materials Board; designation is a signal to lenders and offtakers.
  • Offtake matchmaking. Strategic Projects are natural candidates for the EU's joint purchasing and offtake platforms.

Value-chain stages

StageTypical projects
ExtractionHard-rock and claystone lithium, nickel-cobalt, tungsten, copper, bauxite
ProcessingLithium hydroxide converters, synthetic and natural graphite anodes, cobalt refining, rare earth separation
RecyclingBlack-mass hydrometallurgy, magnet and PGM recycling
SubstitutionTechnologies that reduce demand for a critical material

Who uses the list

Battery and magnet makers look for European feedstock; EPC contractors, equipment vendors and reagent suppliers look for projects with accelerated permits; banks, export-credit agencies and offtakers look for de-risked pipelines. Many projects are promoted by a local subsidiary, so the promoter named in the decision may differ from the listed parent company.

Designation does not guarantee that a project will be built; it speeds permitting and improves access to finance, but each project still needs its own permits and funding.

Frequently Asked Questions

Q.How long can permitting take for a Strategic Project?

Under the CRMA, permit-granting for Strategic Projects should not exceed 27 months for extraction projects and 15 months for processing or recycling projects, excluding environmental impact assessment periods in some cases.

Q.Can projects outside the EU be Strategic Projects?

Yes. Projects in third countries can be recognised if they contribute to EU supply security and benefit the host country, typically in countries with a strategic partnership with the EU.

Q.Does designation come with direct grants?

Not automatically. Designation is mainly a permitting and coordination status; funding comes from existing EU, EIB and national instruments, for which designated projects are prioritised.

Q.Can I buy the list now?

Not yet. Sample rows are free. We try to compile lists that people reserve (we can't compile every list). If we do, we'll email everyone who reserved it a purchase link (buying is optional). If we don't, nothing happens and you're never charged.

Q.What does it cost?

Sample rows are free. A list is $49, paid only if we compile it and you decide to buy. There is no free trial or subscription.