Who is building private fusion power plants
Private fusion has moved from a handful of university spin-outs to a recognisable industry. The Fusion Industry Association (FIA) surveyed 53 companies for its 2025 Global Fusion Industry Report, which counted roughly $9.8 billion in cumulative funding and $2.64 billion raised in the twelve months to July 2025. The 2026 edition surveyed 56 companies, recording six new entrants and three withdrawals, and a record $4.48 billion raised in its twelve-month window. For a supplier or investor, the useful unit is therefore a population of around sixty developers, most of them small, a few of them already ordering large volumes of magnets, vacuum vessels, power electronics and lasers.
Why the confinement approach matters more than the headline
Fusion developers differ less in their goal than in how they hold a plasma at fusion conditions, and that choice decides what they buy. The FIA groups approaches into four families:
- Magnetic confinement — tokamaks (including compact and spherical tokamaks) and stellarators. Their bill of materials is dominated by high-temperature superconducting (HTS) tape and magnets, cryogenics, vacuum vessels, divertor and first-wall materials, and remote handling.
- Inertial confinement — laser- or driver-compressed fuel pellets, following the 2022 ignition result at the US National Ignition Facility. Buyers here are laser diodes, optics and amplifiers, target fabrication and high-repetition-rate chamber engineering.
- Hybrid / magneto-inertial — magnetized target fusion, Z-pinches and field-reversed configurations combine compression with moderate magnetic fields. Pulsed power, capacitors and fast switching dominate their supply chain.
- Electrostatic and other concepts — smaller in number, often focused on neutron sources and early commercial revenue rather than grid power.
Stellarators and tokamaks: the magnet market
Stellarators such as those pursued by Type One Energy (US) and Proxima Fusion (Germany) use complex three-dimensional coils to hold the plasma without a large driven current, trading engineering complexity for steady-state operation. Spherical and compact tokamaks, such as Tokamak Energy's ST40 in Oxfordshire, push magnetic field strength with HTS magnets to shrink the machine. Both groups generate demand for the same scarce inputs — HTS tape, cryogenic plants, precision coil winding and neutron-tolerant materials — so a magnet or cryogenics supplier will usually target them together.
Laser-driven inertial fusion: a different customer
Developers such as Marvel Fusion and Focused Energy, both rooted in Germany, are pursuing laser-driven inertial fusion. Their near-term purchases look like a photonics company's: high-power and ultrafast laser systems, optical coatings, diagnostics and target fabrication. Several also plan revenue from industrial lasers or neutron sources before power plants, which shortens the sales cycle for component vendors.
Where the companies are
| Region | Typical profile | Public programmes that shape procurement |
|---|---|---|
| United States | Largest share of companies and capital; tokamak, stellarator, laser and pinch concepts | DOE Milestone-Based Fusion Development Program, INFUSE awards, utility partnerships |
| United Kingdom | Spherical tokamak and HTS magnet expertise around Culham | UKAEA facilities and the STEP programme |
| Germany | Stellarator spin-outs and laser fusion developers | Federal fusion funding and Max Planck IPP collaboration |
| Japan, China, Canada, rest of Europe | Growing number of start-ups and engineering suppliers | National fusion strategies and public-private partnerships |
Reading a fusion developer as a prospect
- Stage of hardware: a company operating or building a device buys components now; a design-stage company buys studies and prototypes.
- Approach: maps directly onto which product lines are relevant (magnets, lasers, pulsed power, materials).
- Public programme participation: DOE Milestone awardees and national programme partners have milestone-linked budgets and published timelines.
- Utility or site partner: an announced host site or utility agreement signals a move from physics to plant engineering, where nuclear-grade suppliers become relevant.
The FIA membership directory and annual report are the standard starting points for identifying private developers, but they present companies as logos and narrative rather than as a table of approach, country and site, which is the gap a structured list fills.