Maritime & Shipping Reservations open Page created Nov 16, 2026

List of USCG Type-Approved Ballast Water Management Systems

Manufacturers of ballast water management systems (BWMS) that have been issued a U.S. Coast Guard type approval certificate under 46 CFR 162.060, with system model, treatment technology and certificate details for retrofit and newbuild supplier comparison.

Fields we plan to include

Manufacturer
BWMS model
Treatment technology
USCG approval number (162.060/xx/x)
Certificate issue and expiry dates
Treatment rated capacity (TRC) range
Manufacturer country
Operational limitations (salinity, holding time, temperature)
IMO / BWMS Code type approval administration
Company website

Data Preview

* Free sample rows, unverified and may contain errors. This list isn't for sale yet.
ManufacturerBWMS modelTreatment technology
DESMI Ocean Guard A/SSourceCompactCleanFiltration + UV
Kuraray Co., Ltd.SourceMICROFADE IIFiltration + chemical injection at uptake, neutralization at discharge
EcochlorSourceEcochlor BWTSFiltration + chlorine dioxide (ClO2)
Cathelco (Evac Group)SourceEvac EvolutionFiltration + UV
Bawat A/SSourceBawat BWMSHeat (pasteurisation)

Estimated ~55 entries. If people reserve it, we'll try to compile it (we can't compile every list).

* No charge now. Purchase is optional.

How USCG type approval for ballast water systems works

Any ship that discharges ballast water into U.S. waters and uses a ballast water management system (BWMS) to meet the discharge standard must use a system that holds a U.S. Coast Guard type approval certificate issued under 46 CFR 162.060. The Marine Safety Center (MSC) issues these certificates after land-based, shipboard and component testing at an independent laboratory accepted by the Coast Guard. IMO type approval under the BWMS Code is a separate process: a system can be accepted by a flag administration for IMO purposes and still lack a U.S. certificate.

Reading a USCG approval number

Every certificate carries an approval number in the form 162.060/series/revision. The series identifies the system family and the revision increases each time the certificate is amended, renewed or superseded, for example to add new model sizes, relax an operational limitation or reflect a change of ownership. The Coast Guard's redacted copies of certificates are posted for reference only and are not valid for onboard documentation; the ship needs the official certificate from the manufacturer or the MSC. The approval number must also appear on the equipment nameplate together with the manufacturer's name and model.

Certificate expiry and why it matters for retrofits

Type approval certificates carry an expiry date. According to the Coast Guard, that date marks the window in which a system must be manufactured to be covered by the approval; a system built and installed while the certificate was valid remains usable afterwards. For a project manager this means two checks before ordering: that the certificate is current on the expected build date of the equipment, and that the latest revision covers the exact model size and configuration being quoted.

Treatment technologies with U.S. approval

TechnologyHow it worksTypical considerations
Filtration + UVBackflushing filter removes larger organisms; UV reactors disinfect at uptake and again at dischargeNo active substances; power demand and UV transmittance in turbid or fresh water; possible holding-time limits
Filtration + electrochlorinationHypochlorite generated from seawater, either full-flow or side-streamLow-salinity ports may need brine or stored seawater; neutralization required at discharge
Filtration + chemical injectionDosing of a stored or generated biocide such as chlorine dioxide, neutralized before dischargeChemical storage and resupply logistics; low power draw suits high-flow tankers and bulkers
HeatBallast water is heated and held long enough to kill organisms, often using engine waste heatIndependent of salinity and turbidity; depends on available heat and flow rate

Operational limitations to compare

The certificate and its operation, maintenance and safety manual state the conditions under which the approval applies. The most important to compare across suppliers are:

  • Treatment rated capacity (TRC) per unit and the range of model sizes covered
  • Minimum holding time between ballasting and deballasting, which matters for short-sea and shuttle trades
  • Salinity and temperature limits, particularly for systems that rely on electrochlorination or UV
  • Hazardous-area suitability for tankers and gas carriers
  • Requirements for neutralization, sampling points and record keeping

Practical selection steps for owners

  1. Confirm the current approval number and revision with the Marine Safety Center status list and the manufacturer.
  2. Match the treatment rated capacity to ballast pump capacity, allowing for any flow reduction while operating in U.S. mode.
  3. Check the expiry date against the planned manufacturing date of the equipment.
  4. Review service network coverage in the ports where the vessel trades, since commissioning and annual calibration of sensors are needed to stay compliant.
  5. Ask for the alternate management system (AMS) history if an older installation is being upgraded to a type-approved configuration.
Approval numbers in the 162.060 series have reached at least 51, and many certificates have been revised several times, so the series number alone does not show whether a model is currently covered.

Frequently Asked Questions

Q.What does an approval number such as 162.060/26/3 mean?

The middle number identifies the system series and the final number is the revision. Each amendment or renewal raises the revision, and the newer revision supersedes the earlier one. The number must appear on the system nameplate.

Q.Which treatment technology suits low-salinity or fresh-water ports?

Electrochlorination systems can struggle in low-salinity water without stored seawater or brine, and UV systems can lose effectiveness in turbid water. Chemical injection and heat-based systems are less sensitive to salinity, but each certificate states its own operating limits, which should be checked against the vessel's trading pattern.

Q.Is there a holding time requirement for USCG-approved systems?

Some certificates specify a minimum holding time between ballasting and deballasting, typically linked to UV systems. Holding time can be decisive for ferries, short-sea vessels and offshore supply ships with quick turnarounds.

Q.Can I buy the list now?

Not yet. Sample rows are free. We try to compile lists that people reserve (we can't compile every list). If we do, we'll email everyone who reserved it a purchase link (buying is optional). If we don't, nothing happens and you're never charged.

Q.What does it cost?

Sample rows are free. A list is $49, paid only if we compile it and you decide to buy. There is no free trial or subscription.