Australia Climate, Carbon & ESG Reservations open Page created Nov 16, 2026

List of ACCU Scheme Project Proponents in Australia

Organisations registered as project proponents under Australia's ACCU Scheme (formerly the Emissions Reduction Fund), rolled up from individual projects to the proponent level with method type, state, carbon abatement contract status and ACCU issuance. Built for Safeguard Mechanism entities, ACCU brokers and land-sector consultants sourcing units or mapping project pipelines.

Fields we plan to include

Proponent organisation
Project IDs (ERF/EOP)
Method type
Method determination
Project location (state)
Carbon abatement contract ID
Total ACCUs issued
Date project registered
Crediting period end date
Agent (if appointed)
Revoked status
Organisation website

Data Preview

* Free sample rows, unverified and may contain errors. This list isn't for sale yet.
OrganizationProject IDMethod typeProject location
LMS Energy Pty LtdSourceEOP100159WasteNew South Wales
ALFA (NT) LimitedSourceERF106185Savanna Fire ManagementNorthern Territory
OneFortyOne Plantations Pty LtdSourceERF121772VegetationVictoria
Indigenous Land and Sea CorporationSourceEOP100517Savanna Fire ManagementNorthern Territory
Kia Ora Piggery Pty LtdSourceEOP100563AgricultureVictoria

Estimated ~850 entries. If people reserve it, we'll try to compile it (we can't compile every list).

* No charge now. Purchase is optional.

Who supplies Australian Carbon Credit Units

Every Australian Carbon Credit Unit (ACCU) starts with a registered project, and every registered project has a project proponent: the entity that holds the legal right to carry out the project and to which the Clean Energy Regulator (CER) issues units. The CER's ACCU Scheme project register is published project by project. For a buyer, that is the wrong unit of analysis: counterparties, offtake agreements and due diligence happen at the organisation level, and a single developer can sit behind dozens or hundreds of project IDs.

The register published on the CER website held 3,088 project entries when we read it in November 2026, of which 438 were flagged as revoked. Those entries resolve to roughly 1,155 distinct proponent names. A large share of those names are individual landholders (farmers registering a planting or soil carbon project on their own property). The organisations behind the rest — around 850 companies, trusts, Aboriginal corporations, councils and statutory bodies — are the counterparties most institutional buyers actually deal with.

How the register is structured

Each entry carries a project ID (older projects use the EOP prefix from the Carbon Farming Initiative era, newer ones ERF), the proponent, any appointed agent, the method determination, a method type, the project location by state or territory, registration and crediting dates, and units issued by financial year. Where the CER has bought units under a carbon abatement contract, the contract ID (CAC prefix) appears against the project; projects without one show n/a.

Method typeProject entriesTypical proponents
Vegetation1,456Environmental planting developers, plantation forestry companies, human-induced regeneration aggregators
Agriculture1,083Soil carbon aggregators, piggery and dairy operators capturing methane, beef herd management projects
Waste267Landfill gas operators, councils, organic waste processors
Energy Efficiency110Industrial and commercial site operators, cogeneration owners
Savanna Fire Management110Aboriginal land management corporations and ranger organisations in northern Australia
Industrial Fugitives, Transport, Facilities, Carbon Capture62Coal mine operators, fleet operators, Safeguard facilities

New South Wales (894 entries) and Queensland (723) dominate by count, followed by Western Australia, Victoria and South Australia. Counts by state are only a rough guide to volume: savanna burning projects in the Northern Territory and Kimberley are few in number but large in issuance, while soil carbon projects are numerous but many have yet to receive units. Across the register, 935 project entries had received at least one ACCU and 399 carried a carbon abatement contract ID.

Why proponent-level views matter to buyers

  • Safeguard Mechanism entities need a pipeline of eligible units to surrender against baseline exceedances, and want to know which developers have a track record of issuance rather than only registrations.
  • Brokers and traders track which proponents hold uncontracted supply (no CAC ID), since contracted volumes are committed to the Commonwealth until delivery or exit.
  • Project consultants and investors compare developers by method mix — a proponent concentrated in human-induced regeneration carries different integrity and policy risk from one running landfill gas or savanna fire projects.

Reading the method and contract fields

The method type is a broad grouping; the method determination (for example the 2015 savanna fire determination or the 2021 landfill gas electricity generation determination) is what determines crediting rules and remaining crediting period. Several older methods have closed to new projects, and the 2023 independent review of ACCUs (the Chubb Review) led to changes in how human-induced regeneration and landfill gas projects are credited, so the method field is the first thing a due diligence team checks. A contract ID signals that some or all of a project's output was sold to the CER under a fixed-delivery or optional-delivery contract; many optional-delivery contract holders have since exited to sell into the secondary market.

Proponents, agents and related entities

Large aggregators often register projects through several related companies (for example numbered subsidiaries) or act as an agent for landholder proponents. Rolling projects up to a parent group, and keeping the agent separate from the proponent, is the step that turns the register into a counterparty map. Projects with names containing (Revoked), and the register's revoked flag, should be separated from active supply.

Source: Clean Energy Regulator, ACCU Scheme project and contract register. Figures above are counts of register entries as published, not an assessment of project quality or future issuance.

Frequently Asked Questions

Q.What is the difference between a project proponent and an agent under the ACCU Scheme?

The proponent is the entity with the legal right to carry out the project and to which the Clean Energy Regulator issues units. An agent is appointed by the proponent to deal with the regulator on its behalf; aggregators frequently act as agents for landholder proponents, so the commercial counterparty may be the agent rather than the registered proponent.

Q.What do EOP, ERF and CAC prefixes mean?

EOP project IDs date from the Carbon Farming Initiative era, ERF IDs were assigned after the Emissions Reduction Fund began in 2014, and CAC identifies a carbon abatement contract under which the Clean Energy Regulator agreed to buy units from the project.

Q.Can Safeguard Mechanism facilities surrender any ACCU?

Safeguard facilities can surrender eligible ACCUs to manage emissions above their baseline. Since the 2023 reforms, surrendering ACCUs equal to more than 30% of a facility's baseline triggers a requirement to explain why more onsite abatement was not undertaken, so the volume and timing of supply matter as much as price.

Q.Why are savanna fire management projects concentrated in Aboriginal organisations?

Savanna burning projects reduce emissions by shifting fire from late to early dry season across large tropical landscapes, much of which is Aboriginal-owned or managed land. Ranger groups and land councils therefore act as proponents, and the units often attract premium pricing for their co-benefits.

Q.Can I buy the list now?

Not yet. Sample rows are free. We try to compile lists that people reserve (we can't compile every list). If we do, we'll email everyone who reserved it a purchase link (buying is optional). If we don't, nothing happens and you're never charged.

Q.What does it cost?

Sample rows are free. A list is $49, paid only if we compile it and you decide to buy. There is no free trial or subscription.