United States Energy & Utilities Reservations open Page created Oct 29, 2026

Battery Storage Developers in Grid Interconnection Queues

Developers and interconnection customers with battery energy storage projects in US grid interconnection queues (CAISO, ERCOT, PJM, MISO, NYISO, SPP, ISO-NE), with project name, queue position, capacity, county and queue status from each ISO/RTO's published queue.

Fields we plan to include

Developer / interconnection customer
Project name
Queue position / ID
Capacity (MW)
Storage capability (MWh)
ISO/RTO
County and state
Queue date
Queue status (active, withdrawn, in service)
Point of interconnection

Data Preview

* Free sample rows, unverified and may contain errors. This list isn't for sale yet.
DeveloperProjectCapacity (MW)Storage capability (MWh)
Palladium Storage LLCSourcePalladium Storage (NYISO C24-004)140560
Blue Spruce Storage LLCSourceBlue Spruce Storage (NYISO C24-005)3001,200
BayWa r.e Projects LLC.SourceOakdale Battery Storage LLC (NYISO C24-032)150600
TransGrid Energy LLCSourceGemma Energy Storage (NYISO C24-060)200800
EDF power solutions Development, Inc.SourceFraser Energy Storage (NYISO C24-064)135540

Estimated ~2,000 entries. If people reserve it, we'll try to compile it (we can't compile every list).

* No charge now. Purchase is optional.

Who is queuing battery storage on the US grid

Every utility-scale battery project in a US organised market must enter its ISO or RTO's generator interconnection queue before it can be studied, sign an interconnection agreement and connect. Storage has become one of the largest technology categories in these queues, and the queues are the earliest public record of who is developing which project, where and at what size.

What the queues disclose

Each ISO/RTO publishes its own queue format and level of detail. NYISO's spreadsheet, for example, names the developer or interconnection customer for every request and separates serial-queue projects, Cluster 2024 projects, withdrawn requests and in-service projects, with storage capability in MWh. Other markets publish queue IDs, fuel type, MW, county and status, but disclose the customer name to differing degrees, so developer names sometimes have to be matched from study reports and interconnection agreements.

Reading a queue entry

  • The customer is usually a project LLC. Many entries, such as numbered series companies, belong to the same parent developer.
  • Most requests never connect. Historically a large majority of projects entering US queues withdraw, so status and study phase matter more than total MW.
  • Cluster reforms. Following FERC Order No. 2023, ISOs moved from first-come serial queues to cluster studies with higher deposits and readiness requirements, which thins speculative requests.

Who uses the developer list

Battery integrators and cell suppliers, EPC contractors, inverter and transformer makers, tax-equity and debt providers, land agents and offtakers use queue data to find developers before procurement. Capacity (MW) and energy (MWh) together indicate duration — 4-hour systems dominate recent NYISO cluster entries.

Frequently Asked Questions

Q.What changed with FERC Order No. 2023?

It required transmission providers to move to cluster studies, increase study deposits, require site control and impose withdrawal penalties, aiming to clear speculative requests and speed up studies.

Q.Why do so many queued projects withdraw?

High network upgrade costs, failure to secure offtake or land, permitting problems and speculative multiple filings mean most queued requests never reach commercial operation.

Q.What does MW versus MWh mean for a battery project?

MW is the maximum power the battery can deliver; MWh is the energy it can store. Dividing MWh by MW gives the duration, for example 800 MWh at 200 MW is a 4-hour system.

Q.Can I buy the list now?

Not yet. Sample rows are free. We try to compile lists that people reserve (we can't compile every list). If we do, we'll email everyone who reserved it a purchase link (buying is optional). If we don't, nothing happens and you're never charged.

Q.What does it cost?

Sample rows are free. A list is $49, paid only if we compile it and you decide to buy. There is no free trial or subscription.