Who owns US utility-scale battery storage
The most complete public record of US grid batteries is the EIA-860 annual electric generator survey. It covers generators at power plants with 1 MW or more of combined nameplate capacity, which is the practical definition of utility scale. The release of September 10, 2026 carries final 2025 data. Its Operable generator tab shows about 43.6 GW of nameplate battery capacity reported by about 570 utilities and project companies, against a technology that was marginal only a few years ago.
Why the raw files are hard to prospect from
EIA-860 is organised around plants and generators and is spread across several workbooks. Battery-specific details sit in the energy storage schedule, operators and locations in the generator and plant schedules, and shared ownership in the owner schedule. Three features trip up sales teams:
- Operator is not always owner. The generator file is filed by the operating entity. The ownership code shows whether a unit is singly owned, jointly owned or wholly owned by another party, and the owner schedule names those parties.
- Project companies hide the parent. Many sites are filed under a single-purpose LLC, so one developer can appear under many names. Terra-Gen, for instance, appears under several reporting names.
- Hybrid sites blur the count. Storage paired with solar shares a plant code with the solar array, so storage has to be separated by technology.
Where the buyers are
California and Texas dominate capacity, but they are very different markets: California projects tend to be driven by resource adequacy contracts, while Texas assets lean on merchant revenue in ERCOT. Vertically integrated utilities such as Florida Power & Light, Idaho Power and Portland General Electric own storage in rate base and procure through regulated planning cycles. Independent owners buy differently, usually through asset managers and third-party O&M contracts, and they are often the better target for augmentation, repowering and performance services as early fleets age.
Limits of the data
EIA-860 is an annual filing, so a new project may be absent until the next release, and sales of assets may lag. Capacity figures are nameplate power in megawatts as reported, not energy in megawatt-hours, so duration has to be read from the storage schedule.