List of FERC Licensed Hydropower Project Owners

Owners of FERC-licensed hydropower projects, rolled up from project to licensee, for O&M contractors and infrastructure investors tracking capacity and relicensing timing.

Fields we plan to include

Licensee
Project name
FERC project number
State
River
Authorized capacity
License expiration
Relicensing stage
Owner type

Data Preview

* Free sample rows, unverified and may contain errors. This list isn't for sale yet.
CompanyProjectFERC project no.Location
Copper Valley Electric Association, Inc.SourceSolomon GulchP-2742Solomon Gulch Creek, Alaska
Big Wood Canal CompanySourceMagic DamP-3407Big Wood River, Idaho
Green Mountain Power CorporationSourceEssex No. 19P-2513Winooski River, Vermont
Bangor-Pacific Hydro AssociatesSourceWest EnfieldP-2600Penobscot River, Maine
International Falls Power CompanySourceInternational FallsP-5223Rainy River, Minnesota

Estimated ~1,000 entries. If people reserve it, we'll try to compile it (we can't compile every list).

* No charge now. Purchase is optional.

Why hydropower owners matter more than projects

The Federal Energy Regulatory Commission licenses non-federal hydropower under the Federal Power Act, and its records run project by project. Commercial decisions run owner by owner. A contractor bidding on turbine refurbishment or an investor assessing a portfolio needs to know that several projects sit with one licensee and fall due in the same window. NREL counted 1,044 active FERC-licensed projects with 56,103 MW of capacity in figures as of 2019, and the fleet is unusually old and unusually long-lived. The figure of about 1,000 on this page counts projects, not owners. FERC data on licensee numbers could not be retrieved, and the number of owners is lower because one licensee can hold several projects.

The relicensing clock

Few infrastructure assets publish their next major capital event years ahead. Hydropower does. An original license can run up to 50 years and a new license 30 to 50, with a default of 40 years for non-federal dams under FERC's 2017 policy statement. The licensee must file a notice of intent at least five years before expiry, then typically spends years on studies and the application. A National Hydropower Association analysis counts 348 licenses, representing 12,324 MW, expiring between 2026 and 2036.

StageWhat the owner is doingWho should engage
Five or more years outNotice of intent and pre-application documentEnvironmental and licensing consultants
Application tenderedFinal application filed at FERCEngineering firms, agencies, stakeholders
Ready for environmental analysisFERC prepares its reviewConsultants on mitigation measures
New license issuedRequired upgrades and mitigation beginO&M, turbine and civil contractors

Who owns US hydropower

The owner base is more mixed than in most power assets. Investor-owned utilities such as Green Mountain Power sit alongside electric cooperatives such as Copper Valley Electric Association, irrigation companies such as Big Wood Canal Company, and independent project companies. They differ in procurement rules, capital access and appetite for selling. Public bodies follow formal bidding. A small canal company with a single plant may welcome an O&M partner, or a buyer, when relicensing costs arrive. Federal dams run by the Army Corps of Engineers or Bureau of Reclamation are outside this population, though a private licensee may run a powerhouse at one.

Rolling up by licensee is harder than it sounds

Licensees are often special-purpose entities such as a hydro LLC that belongs to a larger fleet owner, and transfers of license are a routine FERC filing. Partnership names can hide the parent, and joint licensees occur. Any owner view should treat the named licensee as the legal holder and confirm the ultimate parent separately before an approach.

Frequently Asked Questions

Q.How long does a FERC hydropower license last?

An original license can run up to 50 years and a new license 30 to 50 years. FERC's 2017 policy set a default of 40 years for original and new licenses at non-federal dams.

Q.When does relicensing start?

The licensee must file a notice of intent at least five years before the license expires. Regulations at 18 CFR 5.5 are cited as a window of five to five and a half years before expiry.

Q.What is the difference between a major and a minor hydropower license?

The terms reflect project size and the application requirements that follow from it. Notices in the Federal Register state the type, such as New Major License or Original Minor License.

Q.Do federal dams need a FERC license?

Federal projects operated by agencies such as the Army Corps of Engineers are not licensed by FERC, but a non-federal developer adding a powerhouse at a federal dam generally is.

Q.Can I buy the list now?

Not yet. Sample rows are free. We try to compile lists that people reserve (we can't compile every list). If we do, we'll email everyone who reserved it a purchase link (buying is optional). If we don't, nothing happens and you're never charged.

Q.What does it cost?

Sample rows are free. A list is $49, paid only if we compile it and you decide to buy. There is no free trial or subscription.