North America Energy & Utilities Reservations open Page created Oct 29, 2026

NERC Registered Entities by Function and Region

Utilities, generators, transmission companies and other entities on the NERC Compliance Registry, with NCR ID, Regional Entity (MRO, NPCC, RF, SERC, Texas RE, WECC) and registered functions such as BA, TO, TOP, GO and GOP including Category 2 inverter-based resources.

Fields we plan to include

Registered entity
NCR ID
Regional Entity (MRO, NPCC, RF, SERC, Texas RE, WECC)
Registered functions (BA, DP, GO, GOP, PCPA, RC, RP, TO, TOP, TP, TSP)
GO/GOP Category 2 (inverter-based resources)
Entity type (IOU, cooperative, municipal, IPP)
Headquarters state
Website

Data Preview

* Free sample rows, unverified and may contain errors. This list isn't for sale yet.
EntityNCR IDRegional EntityFunctions
Wabash Valley Power Association, Inc.SourceNCR00940RF, SERCDP, GO Category 1, TO (RF); DP (SERC)
Owensboro, KY Municipal UtilitiesSourceNCR01290SERCDP, PCPA, RP, TO, TOP, TP
Brownsville Public Utilities BoardSourceNCR04018Texas REDP, TO, TOP, TP
Colorado Springs UtilitiesSourceNCR05106WECCDP, GO Category 1, GOP Category 1, RP, TO, TOP, TP
1000 Mile Solar, LLCSourceNCR13610MROGO Category 1

Estimated ~2,300 entries. If people reserve it, we'll try to compile it (we can't compile every list).

* No charge now. Purchase is optional.

The NERC Compliance Registry

Every organization that owns, operates or uses the North American bulk power system in a way that matters for reliability must register with the North American Electric Reliability Corporation (NERC). Registration determines which mandatory Reliability Standards apply — including the Critical Infrastructure Protection (CIP) cyber security standards — and which of the six Regional Entities audits and enforces them. NERC publishes the active registry as a matrix of entities, regions and functions.

Registered functions

CodeFunction
BABalancing Authority
DPDistribution Provider
GO / GOPGenerator Owner / Generator Operator
PCPAPlanning Coordinator / Planning Authority
RCReliability Coordinator
RPResource Planner
TO / TOPTransmission Owner / Transmission Operator
TP / TSPTransmission Planner / Transmission Service Provider

Category 2 generators: the inverter-based resource wave

NERC revised its registration criteria so that owners and operators of smaller inverter-based resources (IBRs) — solar, wind and battery plants connected at 60 kV or above with at least 20 MVA aggregate nameplate — register as Category 2 Generator Owners and Operators. This has brought hundreds of renewable project companies, often special-purpose LLCs, onto the registry for the first time, each needing compliance programmes, ride-through data, modelling and in some cases CIP controls.

Regional Entities

  • WECC — Western Interconnection, the largest by entity count
  • Texas RE — the ERCOT region
  • SERC — Southeastern and central US
  • RF — Mid-Atlantic and Great Lakes
  • MRO — Upper Midwest and central Canada
  • NPCC — New York, New England and eastern Canada

A single company can be registered in more than one region with different functions in each, so counts by region add up to more than the number of distinct entities.

Who uses the registry

  • Compliance and GRC software vendors segment by function: a TOP or BA carries a much heavier standards load than a stand-alone GO.
  • OT security firms focus on entities whose functions bring medium- and high-impact BES Cyber Systems under CIP.
  • Consultants and IBR equipment vendors target newly registered Category 2 GO/GOP entities.

Frequently Asked Questions

Q.Which NERC standards apply to a Generator Owner?

It depends on registration. GOs are subject to standards on facility ratings, protection system maintenance, modelling data and frequency and voltage ride-through, and to CIP standards for any BES Cyber Systems they own. A GOP adds operating standards.

Q.What is a Category 2 GO or GOP?

A registration category for owners and operators of inverter-based resources that are connected at 60 kV or above with at least 20 MVA aggregate nameplate capacity, but that fall below the traditional bulk electric system thresholds.

Q.What are the six Regional Entities?

MRO, NPCC, ReliabilityFirst (RF), SERC, Texas RE and WECC. They monitor and enforce compliance with NERC Reliability Standards in their footprints.

Q.What is an NCR ID?

The NERC Compliance Registry identifier assigned to each registered entity. The same NCR ID is used across all regions where the entity is registered.

Q.Can I buy the list now?

Not yet. Sample rows are free. We try to compile lists that people reserve (we can't compile every list). If we do, we'll email everyone who reserved it a purchase link (buying is optional). If we don't, nothing happens and you're never charged.

Q.What does it cost?

Sample rows are free. A list is $49, paid only if we compile it and you decide to buy. There is no free trial or subscription.