United States Energy & Utilities Reservations open Page created Nov 9, 2026

List of Nuclear Component Suppliers Inspected by the NRC

Suppliers of safety-related nuclear components and services (pumps, valves, Class 1E electrical and I&C equipment, testing laboratories, engineering and software) whose quality assurance and 10 CFR Part 21 programs the U.S. NRC has inspected, with the facility, report date and the scope the NRC examined. Built for supply chain and QA teams at reactor developers, utilities and EPCs planning RFQs and supplier audits.

Fields we plan to include

Company
Inspected facility (city, state or country)
Inspection report date
Inspection scope (NRC wording)
Component or service category
Notices of Nonconformance or Violation issued
Appendix B criteria cited
ADAMS accession numbers (report, announcement, vendor response)
Number of NRC inspection reports on record
Company website

Data Preview

* Free sample rows, unverified and may contain errors. This list isn't for sale yet.
CompanyCity/stateReport dateItems or services in scope
Flow AmericaSourceHouston, TX02/12/2026ASME Section III Class 1, 2, & 3 code and non-code safety-related pumps, valves, parts, and appurtenances
Henry Pratt Company, LLCSourceKimball, TN10/26/2026ASME code and non-code class II and III valves, valve parts, and appurtenances
Analysis & Measurement Services CorporationSourceKnoxville, TN03/14/2025radiation monitoring equipment and in-core radiation detectors and instrumentation
Operation Technology, IncorporatedSourceIrvine, CA11/21/2025electrical power system analysis and operation software
Mistras ServicesSourceHeath, OH06/30/2025nondestructive examinations of safety-related structures, systems, and components

Estimated ~220 entries. If people reserve it, we'll try to compile it (we can't compile every list).

* No charge now. Purchase is optional.

Reading NRC vendor inspection reports before you shortlist a nuclear supplier

Licensees and applicants answer to the NRC for their own supply chains: they pass the quality requirements of Appendix B to 10 CFR Part 50 down to vendors through purchase orders, and they audit those vendors themselves. The NRC's vendor inspection program samples that chain from the outside. Inspectors visit component manufacturers, testing laboratories, engineering firms, software suppliers and reactor designers, and check whether a vendor's quality assurance (QA) program and its 10 CFR Part 21 program work in practice. Each inspection ends in a public report filed in ADAMS, the NRC's document system, under an accession number that begins with ML.

What the NRC actually looked at

Every report covers a limited scope: selected portions of the QA and Part 21 programs, tied to named activities at a named facility. The NRC states that these inspections do not constitute an endorsement of a vendor's overall QA program, and it keeps no list of approved suppliers. Read the scope line as a record of what was sampled, not as a qualification. Recent scopes show how wide the program reaches:

Supply categoryActivities named in 2025–2026 inspection scopes
Pumps and valvesASME Section III Class 1, 2 and 3 pumps and valves; class II and III valves, valve parts and appurtenances; safety-related pumps and replacement parts
Electrical and I&CClass 1E breakers and switchgear; Class 1E motors and pump equipment; a digital plant protection system; radiation monitoring equipment and in-core detectors
Testing and examinationSafety-related testing; testing and analysis of safety-related components; nondestructive examination of structures, systems and components
Engineering and softwareSafety-related engineering services; electrical power system analysis software; NDE qualification services
Reactor developersDesign and testing work supporting an advanced reactor application; an aircraft impact assessment

Nonconformance or violation: why the wording matters

Appendix B binds licensees, not suppliers. When inspectors find that a vendor did not meet Appendix B requirements imposed on it by contract, the NRC issues a Notice of Nonconformance (NON). Part 21 applies to suppliers of basic components directly, so a failure to evaluate or report defects can draw a Notice of Violation (NOV). Both arrive as enclosures to the inspection report, and the vendor answers in writing, typically within 30 days, with its corrective actions. The reply and the NRC's acknowledgement are filed in ADAMS as well, so one inspection can leave a trail of four documents: the announcement letter, the report, the vendor response and the NRC's acknowledgement of it.

The NRC groups vendor findings under the 18 criteria of Appendix B. The criteria most relevant to a procurement decision are:

  • Criterion III, Design Control: design inputs, verification and change control, central to software and engineered equipment.
  • Criterion VII, Control of Purchased Material, Equipment, and Services: how the vendor controls its own sub-suppliers, including commercial-grade dedication.
  • Criterion IX, Control of Special Processes: welding, heat treatment and nondestructive examination performed under controlled procedures by trained personnel.
  • Criterion XII, Control of Measuring and Test Equipment: calibration and the handling of out-of-tolerance instruments, critical for testing laboratories.
  • Criterion XVI, Corrective Action: whether problems are identified, fixed and kept from recurring.

Commercial-grade dedication

Many safety-related parts start life as commercial products. Part 21 defines dedication as the acceptance process that provides reasonable assurance a commercial-grade item will perform its intended safety function once used as a basic component. The NRC's Regulatory Guide 1.164, first issued in June 2017, endorsed in part, with exceptions, EPRI report 3002002982, the industry guideline for accepting commercial-grade items; the guide was revised in 2024. When a scope names dedication, as a recent valve inspection does, inspectors typically examine how the vendor selects critical characteristics, which acceptance methods it uses and what records it keeps.

How procurement and QA teams use the reports

  1. Match the scope to your purchase. Code versus non-code items, Class 1E versus mechanical equipment, products versus services: an inspection of one product line says little about another.
  2. Check the facility. Reports name the site visited. A company with several plants may have been inspected at only one of them.
  3. Open the enclosures. Look for NONs or NOVs, then for the vendor's reply and the NRC's acknowledgement letter.
  4. Treat the date as a snapshot. An inspection reflects the program on the days the team was on site. Your own source verification, or a shared utility audit such as those organized through NUPIC, still decides who goes on your supplier list.
  5. Look beyond component makers. The program also inspects reactor developers' design organizations, engineering firms and software suppliers, which matters for advanced reactor projects building a supply chain from scratch.

Volume over time

The NRC posts its vendor inspection reports on one web page per year, from 2005 onward. Volume varies widely from year to year: the 2015 page lists 28 reports, the 2020 page 16 and the 2025 page 10. Large vendors appear repeatedly, often at different facilities, while many smaller fabricators and laboratories appear once. Inspections that have been announced but not yet reported carry a report date of TBD.

Frequently Asked Questions

Q.Does an NRC vendor inspection mean a supplier is approved for safety-related work?

No. The NRC describes vendor inspections as limited in scope, covering selected portions of a vendor's quality assurance and Part 21 programs, and states that they do not constitute an endorsement of the vendor's overall QA program. The NRC does not keep a list of approved suppliers; each licensee qualifies its own vendors, usually through its own audits or shared utility audits such as those coordinated by NUPIC.

Q.What does 10 CFR Part 21 require of a nuclear component supplier?

Suppliers of basic components need procedures to evaluate deviations and failures to comply, must notify the NRC of defects that could create a substantial safety hazard, and must post the regulation or a notice describing it where employees can see it. Procurement documents for safety-related items state when Part 21 applies, which is how the obligation follows the item down the supply chain.

Q.How do ASME nuclear certificates relate to Appendix B and NRC inspections?

ASME issues nuclear certificates of authorization after its own survey of a manufacturer, covering construction of Section III code items. Many vendors use the ASME NQA-1 standard to meet Appendix B. An ASME certificate, a utility or NUPIC audit and an NRC inspection are separate checks with different scopes, so procurement teams usually look at all three.

Q.Can I buy the list now?

Not yet. Sample rows are free. We try to compile lists that people reserve (we can't compile every list). If we do, we'll email everyone who reserved it a purchase link (buying is optional). If we don't, nothing happens and you're never charged.

Q.What does it cost?

Sample rows are free. A list is $49, paid only if we compile it and you decide to buy. There is no free trial or subscription.