Reading NRC vendor inspection reports before you shortlist a nuclear supplier
Licensees and applicants answer to the NRC for their own supply chains: they pass the quality requirements of Appendix B to 10 CFR Part 50 down to vendors through purchase orders, and they audit those vendors themselves. The NRC's vendor inspection program samples that chain from the outside. Inspectors visit component manufacturers, testing laboratories, engineering firms, software suppliers and reactor designers, and check whether a vendor's quality assurance (QA) program and its 10 CFR Part 21 program work in practice. Each inspection ends in a public report filed in ADAMS, the NRC's document system, under an accession number that begins with ML.
What the NRC actually looked at
Every report covers a limited scope: selected portions of the QA and Part 21 programs, tied to named activities at a named facility. The NRC states that these inspections do not constitute an endorsement of a vendor's overall QA program, and it keeps no list of approved suppliers. Read the scope line as a record of what was sampled, not as a qualification. Recent scopes show how wide the program reaches:
| Supply category | Activities named in 2025–2026 inspection scopes |
|---|---|
| Pumps and valves | ASME Section III Class 1, 2 and 3 pumps and valves; class II and III valves, valve parts and appurtenances; safety-related pumps and replacement parts |
| Electrical and I&C | Class 1E breakers and switchgear; Class 1E motors and pump equipment; a digital plant protection system; radiation monitoring equipment and in-core detectors |
| Testing and examination | Safety-related testing; testing and analysis of safety-related components; nondestructive examination of structures, systems and components |
| Engineering and software | Safety-related engineering services; electrical power system analysis software; NDE qualification services |
| Reactor developers | Design and testing work supporting an advanced reactor application; an aircraft impact assessment |
Nonconformance or violation: why the wording matters
Appendix B binds licensees, not suppliers. When inspectors find that a vendor did not meet Appendix B requirements imposed on it by contract, the NRC issues a Notice of Nonconformance (NON). Part 21 applies to suppliers of basic components directly, so a failure to evaluate or report defects can draw a Notice of Violation (NOV). Both arrive as enclosures to the inspection report, and the vendor answers in writing, typically within 30 days, with its corrective actions. The reply and the NRC's acknowledgement are filed in ADAMS as well, so one inspection can leave a trail of four documents: the announcement letter, the report, the vendor response and the NRC's acknowledgement of it.
The NRC groups vendor findings under the 18 criteria of Appendix B. The criteria most relevant to a procurement decision are:
- Criterion III, Design Control: design inputs, verification and change control, central to software and engineered equipment.
- Criterion VII, Control of Purchased Material, Equipment, and Services: how the vendor controls its own sub-suppliers, including commercial-grade dedication.
- Criterion IX, Control of Special Processes: welding, heat treatment and nondestructive examination performed under controlled procedures by trained personnel.
- Criterion XII, Control of Measuring and Test Equipment: calibration and the handling of out-of-tolerance instruments, critical for testing laboratories.
- Criterion XVI, Corrective Action: whether problems are identified, fixed and kept from recurring.
Commercial-grade dedication
Many safety-related parts start life as commercial products. Part 21 defines dedication as the acceptance process that provides reasonable assurance a commercial-grade item will perform its intended safety function once used as a basic component. The NRC's Regulatory Guide 1.164, first issued in June 2017, endorsed in part, with exceptions, EPRI report 3002002982, the industry guideline for accepting commercial-grade items; the guide was revised in 2024. When a scope names dedication, as a recent valve inspection does, inspectors typically examine how the vendor selects critical characteristics, which acceptance methods it uses and what records it keeps.
How procurement and QA teams use the reports
- Match the scope to your purchase. Code versus non-code items, Class 1E versus mechanical equipment, products versus services: an inspection of one product line says little about another.
- Check the facility. Reports name the site visited. A company with several plants may have been inspected at only one of them.
- Open the enclosures. Look for NONs or NOVs, then for the vendor's reply and the NRC's acknowledgement letter.
- Treat the date as a snapshot. An inspection reflects the program on the days the team was on site. Your own source verification, or a shared utility audit such as those organized through NUPIC, still decides who goes on your supplier list.
- Look beyond component makers. The program also inspects reactor developers' design organizations, engineering firms and software suppliers, which matters for advanced reactor projects building a supply chain from scratch.
Volume over time
The NRC posts its vendor inspection reports on one web page per year, from 2005 onward. Volume varies widely from year to year: the 2015 page lists 28 reports, the 2020 page 16 and the 2025 page 10. Large vendors appear repeatedly, often at different facilities, while many smaller fabricators and laboratories appear once. Inspections that have been announced but not yet reported carry a report date of TBD.