Who holds a DOE authorization to export U.S. LNG
Every company that exports natural gas from the United States as LNG needs an order from the Department of Energy under Section 3 of the Natural Gas Act. DOE's Office of Fossil Energy and Carbon Management keeps a running summary of long-term export applications, which it reissues periodically as a PDF table. The September 30, 2026 edition shows applications received for the Lower 48 adding up to 88.00 Bcf/d to FTA countries and 73.40 Bcf/d to non-FTA countries. Those totals count every application on file, approved or not, so they describe the permitting pipeline rather than the volume actually being shipped.
For a buyer, the useful unit is the authorization holder, the legal entity named in the DOE order. That is often a project-level LLC (for example a liquefaction company or a train-specific subsidiary) rather than the parent sponsor, and the same terminal can appear under several dockets as expansions, design increases and new trains are filed.
FTA and non-FTA authorizations are two different tests
| Authorization | Legal standard | What it means commercially |
|---|---|---|
| FTA (Section 3(c)) | Exports to countries with a free trade agreement requiring national treatment for natural gas are deemed in the public interest and are granted without modification or delay | Opens a small set of markets (for example Korea, Mexico, Canada, Chile). It is necessary but rarely enough to underpin a large project |
| Non-FTA (Section 3(a)) | DOE publishes a notice in the Federal Register, takes comments, protests and motions to intervene, and makes a public interest determination | Opens Europe, Japan, China, India and most other import markets. This is the order offtakers and lenders look for |
In the DOE summary, non-FTA orders marked (F) are final authorizations and those marked (C) are conditional ones issued before the environmental review was done. Entries flagged as not ready for review are waiting for the National Environmental Policy Act review, normally led by FERC for onshore terminals or by MARAD for deepwater ports, to be completed.
How to read the status column
- Approved: an order is in force for the stated docket.
- Under DOE Review: the application is pending. Many projects hold an approved FTA order while their non-FTA application is still pending.
- Vacated, Withdrawn, Dismissed or Expired: the authorization or application is no longer active. The footnotes usually give the order number and the reason, most often a request by the company itself.
- Design increase: a separate filing to raise authorized volume to match the facility's demonstrated capacity under optimal conditions, reviewed on its own track.
Volumes are listed in Bcf/d of natural gas equivalent. Where a company requested the same quantity in both its FTA and non-FTA applications, the two volumes are not additive: the facility is limited to that single quantity, whichever markets it serves.
Three groups of holders
- Large-scale Lower 48 projects
- Gulf Coast and Atlantic terminals such as Sabine Pass, Corpus Christi, Cameron, Freeport, Calcasieu Pass, Plaquemines, Golden Pass and Cove Point, plus proposed projects that hold orders but have not reached a final investment decision. These carry the multi-Bcf/d authorizations that matter for long-term SPAs and EPC contracts.
- Small-scale exporters
- Under DOE's small-scale rule, applications to export up to 0.14 Bcf/d by ISO container or similar means are deemed consistent with the public interest when no further environmental review is needed. The holders are fuel distributors, virtual pipeline operators and Caribbean or Central American supply businesses, which suits buyers of containerised or bunker LNG.
- Canada and Mexico re-export projects
- Liquefaction plants in Mexico that will process U.S. pipeline gas need DOE authority to re-export it as LNG. The summary lists them separately; in the September 2026 edition, applications in this group add up to 9.12 Bcf/d to FTA countries and 8.11 Bcf/d to non-FTA countries.
Using the authorization data in a deal
- Check the docket, not the brand. Contract counterparties and credit support should match the entity named in the DOE order. The docket number lets you pull the order, its export term and any conditions from DOE's docket index.
- Separate the authorized from the operating. A DOE order says nothing about financing or construction. Combine it with FERC construction status and FID announcements before treating volume as available supply.
- Watch the commencement deadline. Non-FTA orders require exports to begin by a set date, and DOE has vacated authorizations when sponsors abandoned projects. A pending extension request or a footnote describing an amended order signals schedule risk.
- Map EPC and equipment demand to pending expansions. New trains and design increases that are under review or awaiting NEPA completion are where procurement for liquefaction, compression, storage tanks and marine works is still open.
The DOE summary is the authoritative public record of who has asked for, and who holds, U.S. LNG export authority. Each row is a docket, so the same sponsor can appear many times under different entities and volumes.