Aviation, Aerospace & Space Reservations open Page created Oct 29, 2026

Nadcap-Accredited Special Process Suppliers (Heat Treat, NDT, Coatings)

Suppliers holding Nadcap accreditation for aerospace special processes such as heat treating, NDT, chemical processing, welding, coatings and materials testing, for sourcing teams qualifying process sources.

Fields we plan to include

Company
Location
Nadcap commodities (HT, NDT, CP, WLD, CT, MTL)
Merit status
Process methods (e.g. penetrant, anodizing, vacuum brazing)
Other approvals (AS/EN 9100)
Prime customer approvals named
Country
Website
Main phone

Data Preview

* Free sample rows, unverified and may contain errors. This list isn't for sale yet.
CompanyLocationNadcap scope (as published)
Witzenmann GmbHSourcePforzheim, GermanyWelding (WLD), NDT
ZOLLERN GmbH & Co. KGSourceSigmaringendorf, GermanyNDT
Aircraft Philipp Karlsruhe GmbHSourceKarlsruhe, GermanyNadcap (commodity not stated)
EMSSourceAlmelo, NetherlandsHeat treatment and vacuum brazing (2017)
Liebherr Aerospace Brasil LtdaSourceBrazilLiquid penetrant NDT; chemical processing (2025)

Estimated ~3,500 entries. If people reserve it, we'll try to compile it (we can't compile every list).

* No charge now. Purchase is optional.

Nadcap accreditation for special processes

Nadcap (National Aerospace and Defense Contractors Accreditation Program) is run by the Performance Review Institute (PRI), a not-for-profit affiliate of SAE International, and was launched in 1990. Where AS/EN 9100 certifies a supplier's quality system, Nadcap audits individual special processes: processes whose result cannot be fully verified by inspecting the finished part, such as heat treatment or a penetrant inspection. Primes including Boeing, Airbus, Rolls-Royce, Safran and GE Aerospace sit on the task groups and use Nadcap in place of many of their own process audits.

Commodities

CodeCommodityExamples
HTHeat treatingVacuum heat treatment, brazing, carburising
NDTNon-destructive testingPenetrant, magnetic particle, ultrasonic, radiography
CPChemical processingAnodizing, conversion coating, passivation, plating
WLDWeldingFusion, resistance and electron beam welding, brazing
CTCoatingsThermal spray, PVD, diffusion coatings
MTLMaterials testing laboratoriesMechanical testing, metallography, chemical analysis
COMP / NMSBComposites, non-metallic materialsPrepreg layup, sealants, adhesives

Other commodities include measurement and inspection, non-conventional machining and surface enhancement (shot peening), fluids distribution, elastomer seals, electronics and aerospace quality systems.

Merit status and audit cycle

A first accreditation is typically valid for 12 months. Suppliers with clean audit histories earn merit status, which extends the cycle to 18 or 24 months. PRI reports that suppliers on merit have markedly fewer major non-conformances. Merit status is a useful signal when choosing between two accredited heat treaters or NDT houses.

Using the Qualified Manufacturers List

PRI publishes accredited suppliers in the Qualified Manufacturers List (QML) on eAuditNet. Each accreditation is tied to a site and to a specific scope (for example NDT penetrant only), so a supplier accredited for one method is not accredited for all methods in that commodity. Before awarding work, buyers should confirm the site, commodity, scope and expiry in the QML. Many primes also require their own approval of the process in addition to Nadcap. A 2012 SAE report counted more than 3,000 suppliers in the QML; the count shown here is an estimate.

The sample shows the Nadcap scope as each source published it, with the year where the source is a dated announcement. Accreditations expire and should be confirmed in the QML.

Frequently Asked Questions

Q.What is the difference between Nadcap and AS9100?

AS9100 certifies a quality management system. Nadcap accredits specific special processes at a specific site, such as heat treating or penetrant inspection. Many aerospace primes require both.

Q.How long does Nadcap accreditation last?

An initial accreditation is typically valid for 12 months. Suppliers that achieve merit status through clean audits can extend the cycle to 18 or 24 months.

Q.Who decides whether a Nadcap audit passes?

Task groups made up of prime contractor and supplier representatives review audit results and non-conformance responses, with PRI administering the process.

Q.Does Nadcap accreditation replace customer approval?

Not always. Many primes still require their own process approval or source approval in addition to Nadcap before a supplier can process their parts.

Q.Can I buy the list now?

Not yet. Sample rows are free. We try to compile lists that people reserve (we can't compile every list). If we do, we'll email everyone who reserved it a purchase link (buying is optional). If we don't, nothing happens and you're never charged.

Q.What does it cost?

Sample rows are free. A list is $49, paid only if we compile it and you decide to buy. There is no free trial or subscription.