Finding C7 Engine and APU component repair sources under UK Part 145
When an engine shop or airline powerplant team needs to subcontract work on engine accessories — fuel controls, pumps, gearboxes, starters, ignition units, ducting, sensors or a complete auxiliary power unit — the first regulatory question is whether the repair station's approval actually covers that component class. Under UK Part 145, retained from the EU framework after the UK left EASA, this is answered by the C7 Engine — APU component rating, not by the organisation's marketing material or OEM licence alone.
How UK Part 145 ratings are structured
A UK Part 145 approval is issued by the UK Civil Aviation Authority and carries a reference in the form UK.145.xxxxx. The approval schedule is split into classes:
- A ratings — base and line maintenance of complete aircraft (A1 aeroplanes above 5,700 kg, A2 at or below, A3 helicopters, A4 other).
- B ratings — complete engines: B1 turbine, B2 piston and B3 APU.
- C ratings — components other than complete engines or APUs, numbered C1 to C22. C7 covers engine and APU components such as accessory gearboxes, fuel and oil system units, starters and thrust reverser parts, depending on the limitations written into the approval.
- D1 — non-destructive testing as a specialised service.
Holding C7 does not mean an organisation can overhaul a whole engine or APU; that requires B1 or B3. Many sourcing teams need both views: B3 for complete APU shop visits, C7 for the line-replaceable units that come off the engine during a shop visit.
Why the C7 scope is hard to see
The CAA publishes its approved organisations as PDF reports grouped by category — UK-based Part 145, Part 145 overseas, USA-based and Brazil-based Part 145, plus Part 145 holders with TCCA or RBAC approvals. Each entry lists the address, reference number, approval date, regional office, sites, exposition issue and every rating line. The C7 line often carries further wording, and the real capability is defined by the capability list in the organisation's Maintenance Organisation Exposition (MOE), which the public report does not reproduce.
In the 12 November 2026 edition of the UK-based report, 213 organisations appear, of which around 94 hold a C7 rating. The overseas report lists about 280 organisations, roughly 174 of them with C7. That gives a working population in the region of 270, before counting the separate USA-based and Brazil-based reports.
Who holds C7 approvals
| Type of organisation | Typical C7 use |
|---|---|
| OEM and Tier-1 repair centres | Fuel systems, heat exchangers, sensors and controls for the parts they manufacture |
| Independent accessory shops | Multi-OEM repair of pumps, valves, starters and generators |
| Engine and APU specialists | LRU repair alongside B1/B3 shop visits |
| Helicopter and regional operators | In-house component support for their own fleets |
| Specialist processes | Welding, coating, ducting and exhaust repair for engine parts |
Checking a repair source before you place work
- Confirm the approval reference is current in the latest CAA report and not on the suspended or revoked lists, which the CAA publishes alongside.
- Read the full C7 line and any limitation text, then request the MOE capability list for the specific part numbers.
- Check the release certificate your customer needs: CAA Form 1 alone, or dual release under a bilateral arrangement. The CAA also publishes UK Part 145 holders with FAA, TCCA and RBAC approvals.
- Match the approved site to where the work is actually performed; many organisations list several sites.
- For lessor-owned assets, confirm that the shop's documentation will satisfy the return conditions in the lease.
A C7 rating is the regulatory entry ticket, not proof of capability for a given part number. The capability list in the MOE decides what the shop may certify.
Using the approval data in sourcing
Engine shop buyers typically combine the CAA approval fields with their own vendor approval records: the approval reference becomes the key that ties together audit history, quality escapes, turnaround and pricing. The approval date gives a rough indication of how long an organisation has held its UK approval, while the regional office shows which CAA surveyor team oversees it.